Cambridge Y1
Cambridge Y1 Back to Projects Key details 25,000 sq ft Cambridge XLB Project Overview The Y1 property aims to provide the Cambridge area with a new building concept that neither a pure office building or an industrial unit can satisfy. The Mid tech concept is designed to satisfy those occupiers who require a combination of […]
Toolbank
Toolbank Back to Projects Key details 3,500 sq ft Hatfield Goodman Ltd Project Overview Baynham Meikle were retained as consultant civil and structural engineers for the Toolbank (Dormole Ltd) warehouse development on the Hatfield Business Park. This is for Europes leading specialist distributors of hand and power tools to the retail industry which is expanding […]
Wembley Trade Park, Phase 2
Wembley Trade Park, Phase 2 Back to Projects Key details London XLB Projects Project Overview Phase 1 Wembley Trade Park focused on the refurbishment and recladding of existing portal frame warehouse units. Phase 2 involved the demolition of existing structures, the construction of 5 new portal framed units and the recladding of one unit.
Prologis
Prologis Back to Projects Key details 234,718 sq ft Birmingham Prologis UK Ltd Project Overview Baynham Meikle were delighted to be involved in the construction of two industrial warehouse units for Prologis. The first unit covered an area of 77,484 sq ft and the second comprised 234,718 sq ft of space. Both units included office […]
DPD, Geopost
DPD, Geopost Back to Projects Key details 64,00 sq ft Dunstable XLB Projects Project Overview DPD have invested in a new purpose built 64,000 sqft distribution center on the Woodside Industrial Estate in Dunstable. The unit is fitted out with high tech automated sorting conveyors and will have the capacity to handle 6,000 packages an […]
Brammer
Brammer Back to Projects Key details 22,000 sq ft Wolverhampton XLB Project Overview Brammer is a distributor of industrial maintenance, repair, overhaul products and services. They wished to expand their current 80,000 sq ft national distribution centre at Wolverhampton so a 22,000 sq ft extension was proposed along with an access road for a fire […]
Silverstone Delta Motorsport
Silverstone Delta Motorsport Back to Projects Key details 8,000 sq ft of a 15,000 sq ft Towcester Silverstone Estates Project Overview Automotive engineering consultancy Delta Motorsport has moved into 8,000 sq ft of a 15,000 sq ft speculative development industrial unit which joins onto motorcycle manufacturer Ducatis UK headquarters. The new premises are located on […]
Arla Foods
Arla Foods Back to Projects Key details 231,000 sq ft Hatfield Goodman Ltd Project Overview Arla, one of the UK’s leading dairy companies, selected Hatfield as its preferred location for a regional distribution centre which will be operated in partnership with PCL. Arla is responsible for many household names such as Anchor Butter, Lurpak and […]
TBS Engineering
TBS Engineering Back to Projects Key details 80,000 sq ft Gloucester Arlington Project Overview TBS Engineering are involved with the manufacture of lead acid battery assembly and plate manufacturing equipment. Based in Gloucestershire their purpose-built manufacturing and engineering facility includes 80,000 sqft of manufacturing space with a further 20,000 sqft of office accommodation. The main […]
Silverstone, Plot K6
Silverstone, Plot K6 Back to Projects Key details 125,000 sq ft Towcester MEPC Ltd Project Overview Baynham Meikle were involved in the design and construction of a 37,673 sq ft, 3-storey structure providing speculative office and laboratory space. This is the first of four buildings to be set around a quadrangle. Harwell campus has established […]